DOCUMENT LIBRARY


NS Power filed the 2020 Integrated Resource Planning Report with the Nova Scotia Utility and Review Board on November 30, 2020. NS Power provided an IRP Action Plan update in January of 2022 and initiated the 2022 evergreen IRP process. Review the planning tools, models, scenarios, Action Plan Updates and evergreen IRP material below.
2022 EVERGREEN IRP
Evergreen IRP process materials

 

IRP ACTION PLAN UPDATES
The January 2022 IRP Action Plan Update with additions in April 2022 is here. The Update also includes information about the 2022 Evergreen Process to reflect significant policy and legislative changes since the 2020 IRP.
2020 IRP - PRESENTATIONS
The following documents were presented at various stakeholder sessions.
2020 IRP - BACKGROUND MATERIALS
Reference materials related to the 2020 IRP process.
2020 IRP - PREVIOUS IRPS - REFERENCE
Previous IRP submissions are listed here.
2020 IRP - PRE-IRP DELIVERABLES FINAL REPORT
In its Order initiating the 2020 IRP process, the NSUARB requested NS Power complete several Pre-IRP Deliverables prior to the initiation of the formal process. NS Power issued the Capacity Study, Renewables Integration Study, Supply Options Study, and Demand Response program details on July 31, 2019. In addition, the Company hosted four Engagement Sessions on the study work and met with numerous stakeholder groups in an effort to identify and discuss a variety of issues relevant to the planning process. Enclosed are reports, materials and the responses to questions from stakeholders related to the Pre-IRP process.
2020 IRP - TERMS OF REFERENCE
202 IRP - Assumptions and Analysis Plan
Documents shared with stakeholders.
2020 IRP - Scenarios and Modeling
2020 IRP - Initial Modeling Results
June 26, 2020
2020 IRP - Draft Findings, Action Plan, Roadmap
Modeling Results, Findings, Action Plan and Roadmap
2020 IRP - Final IRP Report
IRP Report, IRP Report Summary, IRP Appendices
2020 IRP - Draft IRP Report