Pre-Application Assessment (Optional)

This process applies to generators greater than or equal to 101 kW connected to Distribution Systems rated 26,400 volts and under. It does not form part of the Distribution Generator Interconnection Procedures (DGIP) but is designed to provide system information that can assist in determining the viability of a generation site prior to a formal DGIP application. 

 

 