Pre-Application Assessment

Pre-Application Assessment


 
Pre-Application Assessment (Optional)

This process applies to generators greater than or equal to 101 kW connected to Distribution Systems rated 26,400 volts and under. It does not form part of the Distribution Generator Interconnection Procedures (DGIP) but is designed to provide system information that can assist in determining the viability of a generation site prior to a formal DGIP application. 

 

 

The information on this page was last reviewed on December 06, 2024 

If there are any issues with OASIS please contact NSPSOAdmin@nspower.ca